After Construction

Living Room

Living Room

Hallway

Hallway

Construction Process

Construction Process

Construction Process


Below are the photos of the rooms listed above.
If you would like to enlarge a photo, please click on it. To save it, please right click the photo and select Save.

Exterior

Front

Front

Exterior Walls

The exterior walls of the home are clear cedar that is pre-finished prior to installation.

Front

Front

Exterior Walls - (Repeat)

The exterior walls of the home are clear cedar that is pre-finished prior to installation.

Living Room

First Floor

First Floor

Rail and Stairs

The hand rail is a black ebony hand rail with acrylic balusters. The stairs curve to open into the barrel ceiling.

Hallway

Second Floor

Second Floor

Sitting Area

This is a sitting area that looks over into the living room. The sitting area is under the barrel roof.

Construction Process

First Floor

First Floor

Walls

At this stage, the walls are laid out

First and Second Floor

First and Second Floor

Frame

This is the structural steel frame for the two story home. The grade beam and the block foundation for the home is raised in order to connect to the elevated deck which is supported by the pictured piles.

First and Second Floor

First and Second Floor

Frame

This is the structural steel frame of the two stories of the home.

First Floor

First Floor

Frame

This photo of the house's frame shows the layout of the rounded walls of the home.

First Floor

First Floor

Frame

This is the structural steel frame of the two stories of the home.

Frame of the First Floor

Frame of the First Floor

Frame

This photo of the house's frame shows the layout of the rounded walls of the home.

Back

Back

Deck

This is the frame for the deck. The deck uses CDX type beams.

Second Floor

Second Floor

Layout

The small stubs in the floor are the layout for where the walls of the home are to be built.

Roof

Roof

Roof deck

This is a photo of the finish roof material being installed.

Roof

Roof

Rail

All fiber glass in this photo is hand laid. The glass does not require maintenance over time.

Roof

Roof

Planking

2x6 T&G planking is being installed as the barrel part of the roof. The planking is installed to give the interior ceiling a wood finish.